SWCC Applicant Turbines

A full listing of SWCC Applicants, including turbines with Conditional Temporary Certification and Pending Applications, and past milestone dates for Certified Turbines, are shown below. To sort, click on column headings once for ascending and twice for descending.

NOTE: To compare listings of certified turbine models, see SWCC Certified Turbines - Small and SWCC Certified Turbines - Medium tables

Applicant Turbine SWCC Certification Type1
Under Contract
2
Under Test
3
Reports Submitted
4
Certification
Granted
5
Certification Number
6
Bergey Windpower Co. Excel 10 AWEA 9.1-2009
06/15/2010 06/24/2010
08/01/2011 

11/16/2011
Renewed 11/16/2014

SWCC-10-12
Certification Documents
Bergey Windpower Co. Excel 6 AWEA 9.1-2009
05/27/2010 04/14/2011
03/05/2013 

6/17/2013

Renewed 6/17/2014

SWCC-10-11
Certification Documents
Dakota Turbines DT-30 AWEA 9.1-2009
07/09/2013 12/11/2014
 

 

 

Under Test
Endurance Wind Power Inc. E-3120 IEC 61400-11 & IEC 61400-12-1
09/09/2013 08/03/2013
03/20/2014 

11/26/2013 (Power)

4/17/2014 (Acoustics)

SPP-13-07, SAP-13-07
Certification Documents
Endurance Wind Power Inc. S-343 AWEA 9.1-2009
06/07/2010 07/09/2011
05/14/2013 

7/31/2013

Renewed 7/31/2014

SWCC-10-09
Certification Documents
Evance Wind Turbines Ltd. R9000 AWEA 9.1-2009
08/13/2010 08/13/2010
10/16/2012 

12/18/2012
Renewed 12/18/2013

SWCC-10-27
Certification Documents
Eveready Diversified Products (Pty) Ltd. Kestrel e400nb AWEA 9.1-2009
08/18/2011 07/28/2011
12/03/2012 

2/14/2013

Renewed 2/14/2014

SWCC-10-16
Certification Documents
Kingspan Environmental KW6 AWEA 9.1-2009
04/02/2012 11/03/2011
02/18/2013 

6/17/2013

Renewed 6/17/2014

SWCC-11-04
Certification Documents
Pika Energy T701 AWEA 9.1-2009
06/13/2013 12/12/2013
 

 

 

Under Test
SkyWolf Wind Turbine Corporation SkyWolf 5kW AWEA 9.1-2009
10/25/2013
  Application Pending
Urban Green Energy UGE- 5M AWEA 9.1-2009
11/30/2010 02/26/2013
 

 

 

Under Test
Xzeres Wind Corporation 442SR AWEA 9.1-2009
06/03/2010 12/03/2013
  Limited Power Performance Certification

3/14/2014

LPP-10-10
Certification Documents
Xzeres Wind Corporation Skystream 3.7 AWEA 9.1-2009
06/07/2010 06/07/2010
11/30/2011 

12/19/2011
Renewed 12/19/2013

SWCC-10-20
Certification Documents

1"Certification Type" designates to which Standard(s) the applicant is pursuing SWCC certification: AWEA 9.1-2009 (AWEA), IEC 61400-12-1 (Power Performance), and/or IEC 61400-11 (Acoustics).

2"Under Contract" is the date that the Applicant executed a Certification Agreement with the SWCC.

3 "Under Test" is the date that the small wind turbine began collecting data at the test site after completion of installation, commissioning and instrumentation. "Certified Under MCS" indicates that the product is listed under the UK's Microgeneration Certification Scheme but SWCC has not yet conducted a review of data collected.

4 "Reports Submitted" is the date that the Applicant submitted a complete Test and Analysis Report to SWCC with a Certification Application.

5 "Conditional Temporary Certification" indicates that SWCC has granted this certification as defined in Section F5 of the SWCC Certification Policy. NOTE: SWCC labels, certificates and summary reports are pending for such turbines until they are awarded full SWCC certification. "Limited Power Performance Certification" indicates that SWCC has granted this certification as defined in Section F6 of the SWCC Certification Policy.

6 "Application Pending" designates that applicant has submitted complete Notice of Intent to Submit an Application (NOI), Configuration Description form, Preliminary Review Fee and has signed customized SWCC Certification Agreement confirming plans for testing and analysis.